Monday 16 November 2015

The Station, 'Platform 9 3/4' tidied up.

We have tidied up around the 'platform'!

Sprinklers re-planted; the green caps cover valves to control the flow to this pair of edge sprinklers.

At the far end in the pix the rail top is just below old ground level, the near end it is about 3cm above... 

So next job is to shoot some levels with the Lufkin 'dumpy' level. Then move the rest of the track rotary hoe and dig out the rest of the track base... 

Then a trailer load of granitic sand. 
Oh! and I still have sleepers to finish...