Wednesday 25 November 2015

Back to track work

Now that the turf under the track has been dug out, and the track moved back, I have been levelling, welding joins, installing the sleepers, packing the granitic sand roadbed, and using it to ballast too. 

I am 2/3 of the way done - for the main 33m ( about 8x7m) oval. And it is starting to look like a railway.

With one big shove I can get the small bogie all the way around the 20 odd metres!!!