A blog about the development of the Southern Riverina (Garden) Railway at Mulwala NSW Australia
Wednesday, 25 November 2015
Back to track work
Now that the turf under the track has been dug out, and the track moved back, I have been levelling, welding joins, installing the sleepers, packing the granitic sand roadbed, and using it to ballast too. I am 2/3 of the way done - for the main 33m ( about 8x7m) oval. And it is starting to look like a railway. With one big shove I can get the small bogie all the way around the 20 odd metres!!!