A blog about the development of the Southern Riverina (Garden) Railway at Mulwala NSW Australia
Saturday, 21 November 2015
Sod all... gone
Finished digging out the grass sod from under the main oval of track. Weed mat down. Next weld, and level the track, install granitic base, sleepers... The levels for the "Y" and the side track by the house are dependant on the main track, so they will be last.