Meet Thomas's Friend, 'Esky'!
A blog about the development of the Southern Riverina (Garden) Railway at Mulwala NSW Australia
Friday, 15 January 2016
Meet 'Esky'
Our little basic general purpose locomotive has been re-purposed and re-designated.
Meet Thomas's Friend, 'Esky'!
Meet Thomas's Friend, 'Esky'!
Friday, 8 January 2016
Down the S-Bends...
Both S bend kinks beside the house are finished. So the riding car with feet hanging out clears the water tank and the new slim shed. The track will be level with the top of the brick paving and filled in with granitic sand to the rail tops. Won't be used a lot so a quick sweep will clean the rail tops and clear for wheel flanges.
Friday, 1 January 2016
SRR successful opening...
Sunday, 20 December 2015
Saturday, 19 December 2015
The Siding...
Monday, 30 November 2015
Sunday, 29 November 2015
Friday, 27 November 2015
Main oval circuit is in one piece!
The main 33m oval is in one piece. All welded joins except the removable points which have welded plates at the bottom of the rail, double bolted together. No expansion joints as 2/3 of the track can move on the road bed - enough, I hope. I calculate about 1cm movement from 0 to 40C...Still have some levelling and ballasting to do but...
And still have the Y to do, but have everything lined up and the track is nearly levelled - which affects the levels on the Y of course.
Wednesday, 25 November 2015
Back to track work
Now that the turf under the track has been dug out, and the track moved back, I have been levelling, welding joins, installing the sleepers, packing the granitic sand roadbed, and using it to ballast too. I am 2/3 of the way done - for the main 33m ( about 8x7m) oval. And it is starting to look like a railway.
With one big shove I can get the small bogie all the way around the 20 odd metres!!!
Tuesday, 24 November 2015
Saturday, 21 November 2015
Sod all... gone
Friday, 20 November 2015
Heatwave
Yesterday made 39 celsius, today looks like its done at 34, but it has been over 30 since 1030! Inside jobs tilit cools.
Have decided to use granitic sand roadbase for the railway base. It should set well.
I will get a trailer load and leftovers will fill a few holes in the drive...
Have decided to use granitic sand roadbase for the railway base. It should set well.
I will get a trailer load and leftovers will fill a few holes in the drive...
Wednesday, 18 November 2015
Railway Navie...
Tuesday, 17 November 2015
Rotary Hoe...
I'd sure hate to cut up the cooch grass by hand. Especially this next few days - 32 at the moment, then 34 tomorrow, 39 Thursday. Moneys worth out of the CHonda motor in an hour or so. All the spoil will go to filling in the dip down to the lake. The slope on the right is quite concave...
Now to clean it out by hand - then cart the roadbed in barrow at a time... after I find the right material, at the right price!
Took levels with Maz this morning. The ground level varies about 120mm, so will get the road bed level as I can, then top dress the grass up to level... eventually. But we really just need the main oval finished by Christmas. And FYI, it is a mere 33m around!
Monday, 16 November 2015
The Station, 'Platform 9 3/4' tidied up.
We have tidied up around the 'platform'!
Sprinklers re-planted; the green caps cover valves to control the flow to this pair of edge sprinklers.
At the far end in the pix the rail top is just below old ground level, the near end it is about 3cm above...
So next job is to shoot some levels with the Lufkin 'dumpy' level. Then move the rest of the track rotary hoe and dig out the rest of the track base...
Then a trailer load of granitic sand.
Oh! and I still have sleepers to finish...
Sprinklers re-planted; the green caps cover valves to control the flow to this pair of edge sprinklers.
At the far end in the pix the rail top is just below old ground level, the near end it is about 3cm above...
So next job is to shoot some levels with the Lufkin 'dumpy' level. Then move the rest of the track rotary hoe and dig out the rest of the track base...
Then a trailer load of granitic sand.
Oh! and I still have sleepers to finish...
Saturday, 14 November 2015
Start of the Railcar
Friday, 13 November 2015
Flush concrete Finished!!! ... well all but...
Well, here is the other end of 'Platform 9 3/4'... except for being one bag short! I think I will emboss something in the last little triangle...
Tried a new idea with this and cut 20mm wide strips of a 6-7mm old foam hiking mattress and put the strips in the gap... saved a lot of time cleaning out the rail-checkrail gap. Worth it!
Tuesday, 10 November 2015
SW end (of the 'station' is) DONE!
Monday, 9 November 2015
Even more concrete...
Doesn't look much, but that is 8 bags, 160kg+water, of concrete.
Getting tricky as the adjoining extant concrete starts to slope to the boat ramp.
Only about 2 bags to go... on this end anyway! The lawn watering will be re-buried along the edge of the new concrete. The sprinkler about 15cm to the left of where it sits in the pic.
The other sprinkler will be similarly placed inside the concrete curve at the other end.
Getting tricky as the adjoining extant concrete starts to slope to the boat ramp.
Only about 2 bags to go... on this end anyway! The lawn watering will be re-buried along the edge of the new concrete. The sprinkler about 15cm to the left of where it sits in the pic.
The other sprinkler will be similarly placed inside the concrete curve at the other end.
Sunday, 8 November 2015